Premises delivered

Shops, offices, restaurants and practices, with the place, the year and how long the works took.

House among the vines

A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.

Place
Saint-Cyr-au-Mont-d'Or, 2025
Works
11 months on site
Timber frame, larch cladding, wood fibre insulation

Restored stone farmhouse

A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.

Place
Lozanne, 2024
Works
9 months on site
Rubble stone, lime render, oak joinery

Glass extension on a 1930s house

A 38 m² kitchen and dining room opening onto the garden, under a building permit.

Place
Caluire-et-Cuire, 2025
Works
6 months on site
Steel frame, full-height glazing, reclaimed brick

Flat in an old building

A 95 m² flat redrawn around its original fireplaces: one corridor fewer, one bedroom more.

Place
Lyon 6e, 2024
Works
4 months on site
Oak parquet, lime plaster, made-to-measure joinery

Shop front and boutique

A new shop front and a 70 m² boutique, accessible to wheelchair users, fitted out between two seasons.

Place
Lyon 2e, 2023
Works
10 weeks on site
Steel, glass, terrazzo floor

Garden studio

A 24 m² studio at the end of the garden, built dry in untreated larch, under a planning declaration.

Place
Charbonnières-les-Bains, 2023
Works
4 months on site
Untreated larch, solar panels, timber floor

Tell us about your premises.

The address, your activity, the surface and the date you want to open. We call you back to visit.